As shown in the figure consider a 
         transformers; 
        Transformer capacity is  MVA.  
        HV CTR is /1 Amp 
        and it's LV CTR is /1 Amp. 
        132kV Bus Three Phase short circuit MVA is  MVA 
        and transformer percentage reactance is  %.  
        Transformer has 17 taps and normal tap is 
        
        
Information of provision of alarm and Load Trimming Scheme is as below
ALARM =
LTS =
        
        
Calculate HV Side and LV Side Over Current relay settings for the transformer.
        
(NOTE: While calculating HV side O/C PSM for under loaded T/F it is not necessary to consider T/F HV side current on extreme tap. For fully loaded T/F HV side PSM shall be as per current on extreme tap; it shall be 5% more along with Alarm scheme and 10% along with LTS)
      Information of provision of alarm and Load Trimming Scheme is as below
ALARM =
LTS =
Calculate HV Side and LV Side Over Current relay settings for the transformer.
(NOTE: While calculating HV side O/C PSM for under loaded T/F it is not necessary to consider T/F HV side current on extreme tap. For fully loaded T/F HV side PSM shall be as per current on extreme tap; it shall be 5% more along with Alarm scheme and 10% along with LTS)
 
   
      
        Section-A: Calculations for Fault Current and PSM.     
      
              
      
      
        1) Source reactance at 100 MVA base =  
         %
      
       
      
        2) T/F % impedance at 100 MVA base =  
         %
      
       
      
        3) LV Bus Source reactance at base 100 MVA =  
         %
      
       
      
        4) LV Bus Short Circuit MVA =  
           MVA
      
       
      
        5) T/F LV Short Circuit Current =  
           Amp.
      
       
      
        6) T/F HV Short Circuit Current =  
           Amp.
      
       
      
        7) Transformer LV side O/C Relay PSM =  
           %.
      
       
      
        8) Transformer HV Side O/C Relay PSM =  
           %.
      
       
              
        9a) T/F LV O/C Relay Current for LV Bus Fault =  
         Amp.
        
      9b) T/F HV O/C Relay Current for LV Bus Fault = Amp.
 
              
        10a) T/F LV Side O/C Relay Current as Multiple of PSM = 
         
        
      10b) T/F HV Side O/C Relay Current as Multiple of PSM =
 
              
        11a) T/F LV Side O/C Relay Operation Time with TMS=1 =  
         Sec.
        
      11b) T/F LV Side O/C Relay Operation Time with TMS=1 = Sec.
 
              
        12a) T/F LV Side O/C Relay TMS =  
         
        
      12b) T/F HV Side O/C Relay TMS =
 
              
        13a) T/F LV Side O/C Highset Current Setting =  
         Amp.
        
      13b) T/F LV Side O/C Highset Delay Setting in miliseconds = ms
 
              
        14a) T/F HV Side O/C Highset Current Setting =  
         Amp.
        
      14b T/F HV Side O/C Highset Delay Setting in miliseconds = ms
 
      
IN question no.8 HV side PSM is 27.25 as per its HV full load current but it is showing wrong answer need to be corrected