Setting Calculations for ICTs operating in grid.
Example: A 220/132kV S/S has two ICTs operating in parallel having capacity 200 and 100 MVA. Its HV side and IV side CT ratios are as shown in figure. AS ICTs are under loaded either alarm or load trimming scheme is not provided. Reactance data for HV and IV grid sources and ICTs is as shown in following table. For both ICTs delta tertiary is closed. Calculate the HV side and IV side backup relay settings for both ICTs.





Table-1: % Reactance Data for ICTs
SrNo
ICT Name
Capacity
% Reactance
Primary-Secondary
Primary-Tertiary
Secondary-Tertiary
1.
ICT-I
200 MVA
13%
37%
26%
2.
ICT-II
100 MVA
12%
35%
25%

Table-2: Source Reactance Data
SrNo.
Source
Positive Sequence Source Reactance X1S
Zero Sequence Source Reactance X0S
1.
HV Side grid of the Substation
4.5%
7.0%
2.
IV Side grid of the Substation
11.0%
17.0%